• E-mail: bob@conele.com
    • sns01
    • sns02
    • sns03
    • sns04
    • sns05
    • sns06
    • sns07

    Short Lead Time for Putzmeister Concrete Pump And Hose - Stationary concrete placing boom HGY28 – CO-NELE

    Short Description:


    Product Detail

    Product Tags

    Related Video

    Feedback (2)

    "Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our company for the long-term to develop together with customers for mutual reciprocity and mutual benefit for Concrete Truck For Sale , Pumping Cement , Concrete Mixer Pump , We welcome new and old clients from all walks of lifestyle to speak to us for potential organization relationships and mutual success!
    Short Lead Time for Putzmeister Concrete Pump And Hose - Stationary concrete placing boom HGY28 – CO-NELE Detail:

    Model: HGY28,HGY32
    Mode of drive:Fully hydraulic
    Boom Structure:28-3M, 32-3M/4M
    Pipeline diameter:125mm

    Features:
    When using,it is ancred to the floor with initiallly prepared holes. If it is required to rise up,a tower crane is needed to lift the placing boom up to the next higher floor for being anchored.one time climbing can meet the requirements of concrete placing for two floors. Compact design,easy operation,reliable safety and suitable the construction of high building. 

    Item HGY21-3M HGY24-3M HGY28-3M HGY32-3M
    Type Stationary
    Horizontal Reach 21m 24m 28m 32m
    Rotation 360°
    Elevation Angle 0-85° 0-85° 0-85° 0-85°
    Voltage 380V/50HZ
    Power 5.5 5.5 11 22
    Boom Open Way 3R         3R 3R 3R
    Boom Length(mm) 6500/7500/4500 12000/7500/4500 12000/9100/6200 13970/10600/7430
    Corner 85°/180°/180°
    End RubberHose 3m
    Inner Diameter Φ125mm
    Weight  14.3t 14.5t 16.5t 17t
    Packing  40HQ*1 40HQ*2 40HQ*2 40HQ*2

    Product detail pictures:

    Short Lead Time for Putzmeister Concrete Pump And Hose -
 Stationary concrete placing boom HGY28 – CO-NELE detail pictures


    Related Product Guide:
    New Braunfels man dies after crash with cement mixing truck | Concrete Pump Inspection Checklist
    Truck-cement mixer crash closes Spring Bay Road north of Route 116 – News – Journal Star | Concrete Mixer Truck Self Loading

    Fast and superior quotations, informed advisers to help you choose the correct merchandise that suits all your requirements, a short generation time, responsible quality control and different services for paying and shipping affairs for Short Lead Time for Putzmeister Concrete Pump And Hose - Stationary concrete placing boom HGY28 – CO-NELE, The product will supply to all over the world, such as: Turkey , Danish , venezuela , Based on our automatic production line, steady material purchase channel and quick subcontract systems have been built in mainland China to meet customer's wider and higher requirement in recent years. We have been looking forward to cooperating with more clients worldwide for common development and mutual benefit!Your trust and approval are the best reward for our efforts. Keeping honest, innovative and efficient, we sincerely expect that we can be business partners to create our brilliant future!
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Victoria from Afghanistan - 2016.06.19 13:51
    This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Helen from Argentina - 2016.08.15 12:36
    WhatsApp Online Chat !