• ໂທລະສັບ: +86 13963912630
  • ໂທລະສັບ: +86 18306398869
  • ອີເມລ໌: cassie@conele.com
  • ອີເມລ໌: bob@conele.com
    • sns01
    • sns02
    • sns03
    • sns04
    • sns05
    • sns06
    • sns07

    Mobile placing boom HGY15

    ລາຍລະອຽດສັ້ນ:

    ຄຸນນະສົມບັດໂຄງສ້າງແຂນ

    "Z" -shaped ສາມພາກແຂນພັບ, 360 ° ພືດຫມູນວຽນ, pitching ແລະການຂະຫຍາຍຕົວກວ້າງຂວາງ, ແມ່ພິມສໍາລັບທັງຫມົດມິຕິລະດັບໃນຊ່ອງສາມມິຕິລະດັບພາຍໃນຄວາມຍາວຂອງຂະຫຍາຍຕົວຢ່າງໄດ້, ບໍ່ມີ casting ມຸມຕາຍ, ສາມາດໄດ້ຢ່າງງ່າຍດາຍບັນລຸກໍາແພງ, ທໍ່ນ້ໍ, ຖັນ, Piles ແລະອື່ນໆຫລໍ່ກໍ່ສ້າງສີມັງ, ...


  • ກຸ່ມນະໂຍບາຍ: ສະຫະລັດ $ 5000-100000 / ທີ່ກໍານົດໄວ້
  • ຕົວຂຶ້ນໄປຈໍານວນ: 1set
  • ຄວາມສາມາດໃນການສະຫນອງ: 300 / ກໍາຫນົດຄ່າເດືອນ
  • Port: qingdao
  • ເງື່ອນໄຂການຊໍາລະເງິນ: L / C, D / A, D / P, T / T
  • ລາຍລະອຽດຜະລິດຕະພັນ

    Tags ຜະລິດຕະພັນ

    1. Technical date

    ລາຍການ 

    HGY15 without wheel

    Placing Boom Max. Working Radius

    15m

    ພືດຫມູນວຽນ

    360 °

    Elevation angle

    0°~90°

    Placing Boom Slewing Working Scope

    completely slewing

    Working environment temperature

    -5~40

    Hydraulic System Motor Power

    4kw

    Hydraulic System Working Pressure

    20Mpa

    Slewing Speed

    0.2~0.3r/min

    Concrete Delivery Pipe Specification

    Φ125*4

    Rubber Hose Length

    3m

    Outrigger Span

    4000*4000mm

    Machine Total Weight

    3230kg

    With Counterweight Weight

    5430kg

    Overall Dimension

    8900*4000*2585mm

     

    ລາຍການ

    HGY15 with wheel

    Placing Boom Max. Working Radius

    15m

    ພືດຫມູນວຽນ

    360 °

    Elevation angle

    0°~90°

    Placing Boom Slewing Working Scope

    completely slewing

    Working environment temperature

    -5~40

    Hydraulic System Motor Power

    4.5kw

    Hydraulic System Working Pressure

    20Mpa

    Slewing Speed

    0.2~0.3r/min

    Concrete Delivery Pipe Specification

    Φ125*4

    Rubber Hose Length

    3m

    Outrigger Span

    4000*4000mm

    Machine Total Weight

    4500kg

    With Counterweight Weight

    6700kg

    Overall Dimension

    8900*4000*2585mm

    1.The boom adopts the “R” -shaped three-section folding arm, which can realize 360 ° full rotation and at the same time to complete the pitch fluctuation and the development of the boom, the folding arm movement, in the length of the boom to achieve three-dimensional space of all-round casting, No pouring dead ends, can easily achieve the wall, pipe, column, pile and other vertical structure of concrete pouring.

    2.boom of the folding, pitching, rotation are driven by the hydraulic, through the button to control the working of machine.

    3. We have the fixed one and the mobile one to meet your different requests.

    HGY15


  • ທີ່ຜ່ານມາ:
  • ຕໍ່ໄປ:

  • 
    WhatsApp Chat ອອນໄລນ໌!